Hi Dr. Marwan,
I am confused by the ordering of the output of the CRQA toolbox.
My confusions:
1) In the GUI, T1 becomes RTE when "apply" is clicked. The value when "stored" is outputed to Y(:,9), which the manual states is T1. Why then does T1 become renamed to RTE in the GUI? Is this a software mistake?
2) The T2 value displayed in the GUI, when outputted, is placed in Y(:,11), which the manual states is RTE [not T2]. Comparing the GUI with the "stored" output, T2 has discrepant values.
3) When I calculate the RPDE of my time series using the RPDE function with the same parameters as in the GUI, I get discrepant entropy values. Shouldn't the RPDE be similar to Y(:,11)? And Y(:,11) is the T2 value (not the RTE value)!
So is there a mismatch between the ordering of output, or the GUI display?
Thank you greatly,
Alex Wong
Is there a mismatch between the ordering of output, or the
-
- Junior
- Posts: 2
- Joined: Sun Jul 1, 2012 17:25
- Affiliation (Univ., Inst., Dept.): Florida Atlantic University
- Location: Delray Beach, FL, USA
- Research field: Psychology
- Norbert
- Expert
- Posts: 194
- Joined: Wed Jan 4, 2006 11:03
- Affiliation (Univ., Inst., Dept.): Potsdam Institute for Climate Impact Research, Germany
- Location: Potsdam, Germany
- Location: Potsdam Institute for Climate Impact Research, Germany
Re: Is there a mismatch between the ordering of output, or t
Hi Alex,
thank you very much for this bug report. I will have check. Perhaps it is a bug in the code.
Best regards
Norbert
thank you very much for this bug report. I will have check. Perhaps it is a bug in the code.
Best regards
Norbert